RB iconIP iconMPE iconRBAS iconRouse icon

V-Tech VERLIFT

不含税价格

Favorite收藏
share分享
Save search保存搜索
打印

信息

类别
塔式起重机
品牌/型号
V-Tech VERLIFT
生产年份
2009
使用小时
8663 小时
设备所在位置
Bassum, Vokietija, Vilniaus apskritis
国家
立陶宛
马斯客 ID
6C1F24ED

定价

选择币种

详细信息

毛重
6134 公斤
最大起重能力
32000 公斤
吊杆长度
1180 厘米
最大举升高度
7700 厘米
平衡锤
Concrete block
原色
Yellow
托架类型
带轮子的
附属装置
With the VERLIFT crane it is possible to build up in very extreme conditions (wind and temperature) safely element by element. During the design time minimisation has also been taken into account for the positioning to object. All parts of the VERLIFT can be transported in a 20’ or 40’ container, which makes the freight forwarding to hard reachable destinations easier. The Crane is also equipped with an optional self-drive-mechanism, in order to be able to move itself. As soon as the object is assembled completely, the VERLIFT is able to lower itself through the windmill. The VERLIFT is designed in a way that the transportation is possible within three (3) 40’ containers (of which one is a 1 flat rack) and the weights and dimensions of it are as follows (last photo). Counterweight: in concrete block in the ground. Calculation standard All calculations were made according to Eurocode.
其他信息
With the VERLIFT crane it is possible to build up in very extreme conditions (wind and temperature) safely element by element. During the design time minimisation has also been taken into account for the positioning to object. All parts of the VERLIFT can be transported in a 20’ or 40’ container, which makes the freight forwarding to hard reachable destinations easier. The Crane is also equipped with an optional self-drive-mechanism, in order to be able to move itself. As soon as the object is assembled completely, the VERLIFT is able to lower itself through the windmill. The VERLIFT is designed in a way that the transportation is possible within three (3) 40’ containers (of which one is a 1 flat rack) and the weights and dimensions of it are as follows (last photo). Counterweight: in concrete block in the ground. Calculation standard All calculations were made according to Eurocode. The following load factors were considered: static: factor 1,4 dynamic: factor 1,2 Wind speed limit For the maximum admissible wind speed, following values must be respected: Lifting operations: 12 m/s Telescopic manipulation of the tower: 20 m/s Stand-still, boom as high as possible (± 12 m tower free): 60 m/s Stand-still, boom just above the windmill: 114 m/s Temperature limit The temperature during which can be worked must be restricted between -40°C to +60°C, due to the limitations of the cable sheaves.显示更多

UAB WIND TURBINE

Vėtrungių gatvė 87-56 LT-06331 Vilnius, Vilniaus Apskritis 立陶宛
获取电子邮箱通知
report ad举报可疑广告