小松 PC 400-7
不含税价格
打印
信息
类别
履带挖掘机
品牌/型号
小松 PC 400-7
生产年份
2016
使用小时
3850 小时
附加选项
演示
国家
中国
一般等级
1
2
3
4
5
马斯客 ID
1BE90A0B
定价
选择币种
详细信息
电源类型
液化气
发动机
SAA6D125E - 3
毛重
41400 公斤
发动机输出功率
246 kW (334 马力)
发动机制造商
KOMATSU
排放标准
第IV阶段
料斗容积
1.90 m3
履带宽度
600 mm
最大速度
5.50 千米/小时
运输尺寸(长x宽x高)
11940 x 3340 x 3660 mm
原色
Original
制造国
日本
成交条件
FOB, CFR, CIF, EXW
配件
GPS
空调
铲斗
电池切断器
操纵杆
标准挖土铲斗
其他信息
The Komatsu PC400-7 is a 40-ton heavy-duty tracked backhoe excavator. With its powerful engine and stable operating performance, it is widely adaptable to various large-scale heavy engineering projects.
Applicable Scenarios:
Mining Operations: As one of the core application scenarios for this model, its 275kN bucket digging force easily handles the excavation and stripping of hard materials such as ore and hard rock. Meanwhile, its 41.4-ton overall weight and stable tracked walking design maintain operational stability on uneven mine terrain, making it suitable for daily mining and slag removal work in open-pit coal mines, iron mines, and other open-pit mines.
Large-Scale Earthmoving Projects: It offers significant advantages in large-scale earthmoving operations such as urban new area development and industrial park site leveling. With a 1.9m³ bucket capacity and high-efficiency operation, it can quickly complete large-scale earthwork excavation and transportation. Its maximum digging radius of 12025mm and maximum digging depth of 7820mm also meet the needs of deep earthwork excavation, significantly improving the efficiency of site leveling and foundation excavation.
Road and Infrastructure Construction: Suitable for roadbed engineering of large-scale transportation infrastructure such as highways and railways, it can efficiently carry out roadbed excavation, filling, and slope trimming operations. Its 70% climbing ability can handle slope scenarios in roadbed construction, while its strong traction ensures stable movement on soft ground in unfinished roadbeds. It can also be used for bridge foundation pit excavation, matching the construction intensity of large-scale infrastructure projects.
Water Conservancy Projects: Suitable for river dredging, reservoir dredging, and dam construction. Its tracked design allows it to operate in muddy terrain near water, and its large digging depth can handle silt and rocks at the bottom of the river. Its powerful boom digging force (214kN) can help with earthwork compaction and slope trimming during dam construction, ensuring the quality and progress of water conservancy projects.
SHANGHAI DIGE ENGINEERING MACHINERY CO.LTD
闵行区景东路3539A 200000 上海 Shanghai 上海 中国