RB iconIP iconMPE iconRBAS iconRouse icon

Metalika C-1200 Concrete pipe making machine

不含税价格

向卖家询价

Favorite收藏
share分享
Save search保存搜索
打印

信息

类别
加气混凝土生产设备/制砖机
品牌/型号
Metalika C-1200 Concrete pipe making machine
生产年份
2020
附加选项
未使用
设备所在位置
Sopot (Srbija)
国家
塞尔维亚
一般等级
1
2
3
4
5
马斯客 ID
778AEBF6

详细信息

发动机
Elektro
状态/质保
12 meseci
制造国
塞尔维亚
成交条件
FCA, CPT, CIP, DAT, DAP, DDP, FAS, FOB, CFR, CIF, EXW
证书
EPA环境保护署, CE认证, ANSI, AS, CSA, EAC GOST, TRUA, JIS
配件
操纵系统
控制室
混凝土存储器
其他信息
Concrete Pipe Machine C-1200 (Machine for producing concrete pipes). Machine for producing concrete pipes C-1200 produces concrete pipes diameter from 300-1200mm by vibrating of core. Machine is placed in concrete base built according to manufacturer’s layout. Forming head, electric and hydraulic controls are placed above surface. Main parts of C-1200: - Main hydraulic cylinder stand - Hydraulic cylinder with core bearer - Core with vibrators Bfkxkxxqdc - Chassis with steel plate Technical data of Concrete Pipe making machine C-1200: - Pipe diameter: fi200 - fi1200 - Pipe height max: 1m - Installed power: 18 kW / 380 V - Simultaneously max: 11 KW Capacity for producing concrete pipes height 1m: 1. 150 pipes - fi300 per 8h 2. 150 pipes - fi400 per 8h 3. 120 pipes - fi500 per 8h 4. 90 pipes - fi600 per 8h 5. 50 pipes - fi1000 per 8h 6. 40 pipes - fi1200 per 8h - Concrete base dimensions: 4100x3470x2150 - Forming head height 1500 mm. - Total weight without ring pads: 6135 kg (with outside moulds and core fi300/400/600) Number of workers needed: •Concrete transport from concrete plant to machine C-1200: 1 •Operator C-1200 : 1 •Fresh pipes transport from machine to curing place with accu cart: 1 or •Fresh pipes transport from machine to curing place with standard cart for fi300-fi 700mm: 1 or •Fresh pipes transport from machine to curing place with standard cart for fi800-fi 1200mm: 3 •Worker for placing ring pad in machine: 1 Space required for machine C-1200……………………… 70m2 Storage place for ring pads and moulds......………………..10m2 Space required for daily production of pipe fi 1000mm: •45 pipes fi 1000: 60m2 •Pipes need to cure 48h before removing ring pad: 120m2 •Pipes need to cure for 10 days before transport (storage of products): 400m2 Total space required for production of pipes: 660m2 + 100m2 for transport paths = 760m2 *It is good to have all this space indoor, but necessary indoor space is only for machine (70m2), rest can be done on the outdoor. Mechanisation: Forklift 5t, with silo, for concrete transport (from concrete plant to machine C-1200) For more extra optional equipment and detail offer, send inquiry or call me on my mobile number.显示更多

METALIKA SMTR

Milosava Vlajića 116e 11450 Sopot Beograd, Srbija 塞尔维亚
获取电子邮箱通知
report ad举报可疑广告